Fieldbook

LANGUAGE

Glossary

Shared words across the seven courses, so PCA, code, and safety vocabulary stop colliding.

  • Ball-in-court

    Procore field tools

    Whose turn it is to act on an RFI, submittal, or similar item.

  • Braced wall panel

    ICC B1 Residential

    A specific wall segment built and located to resist racking. Not 'plywood somewhere.'

  • A record of a potential cost or schedule change before it becomes a change order.

  • Competent person

    OSHA 30 Construction

    Someone who can identify the relevant hazards and has authority to correct them.

  • De minimis

    ASTM E2018 PCA

    Too minor to treat as a material deficiency. Often routine maintenance. Not a label for life-safety issues.

  • A defined checkbox on the TREC form. Broader than 'destroyed.' Read the form definition.

  • Emergency escape and rescue opening. Required at sleeping rooms, with area, dimension, and sill limits.

  • Expected useful life and remaining useful life. Planning judgments from age and condition, not warranties.

  • Facility Condition Index. Deferred maintenance cost divided by current replacement value.

  • Fireblocking

    ICC B1 Residential

    Material installed to cut off concealed draft openings inside framing. Not a synonym for draftstopping.

  • Falls, struck-by, caught-in/between, and electrocution.

  • General duty clause

    OSHA 30 Construction

    OSH Act section 5(a)(1). Employers must keep the workplace free of recognized serious hazards.

  • Ground-fault circuit interrupter. Expected protection on temporary construction power.

  • Hierarchy of controls

    OSHA 30 Construction

    Elimination, substitution, engineering, administrative, PPE.

  • Immediate costs

    ASTM E2018 PCA

    Opinions of cost for deficiencies that need action now: safety, material code or fire issues, or failures that will cascade.

  • Job hazard analysis. Steps, hazards, controls, then revision when the work changes.

  • Material defect

    InterNACHI CPI

    A condition that significantly affects value, safety, or intended function.

  • Opinion of probable cost

    ASTM E2018 PCA

    A supported estimate, not a bid. Disclose dollar year, basis, and exclusions.

  • Property condition assessment. A baseline process of walk-through, documents, and interviews to find material physical deficiencies.

  • Property condition report. The work product of a PCA, including opinions of cost.

  • Environmental site assessment under ASTM E1527. Not part of a baseline PCA conclusion.

  • Physical deficiency

    ASTM E2018 PCA

    A conspicuous defect or significant deferred maintenance of a material system or component.

  • Promulgated form

    TREC inspector path

    TREC's required inspection report form (the REI form) for inspections that must use it.

  • Qualified person

    OSHA 30 Construction

    Someone with the technical credentials or knowledge to solve a specific problem. Not the same as competent.

  • Request for information. A formal question about a gap or conflict in the contract documents.

  • Route of entry

    BCSP STSC

    How a chemical gets in: inhalation, ingestion, absorption, or injection.

  • Short-term costs

    ASTM E2018 PCA

    Priority repairs that are not emergencies and are beyond routine preventive maintenance.

  • Safety Trained Supervisor Construction. A BCSP credential for supervisors with safety duties.

  • Uniformat II

    ASTM E2018 PCA

    ASTM E1557 component classification used heavily in facility condition work.

Fieldbook is original study material so you walk into each paid course already oriented. It is not the ASTM standard, an OSHA outreach card, an ICC exam, a TREC license, or BCSP’s item bank. Code numbers and blueprint weights change by edition. Confirm them in the book or bulletin you will be tested on. Nothing here is legal, licensing, or benefits advice for your VR&E file.