Ball-in-court
Procore field toolsWhose turn it is to act on an RFI, submittal, or similar item.
Braced wall panel
ICC B1 ResidentialA specific wall segment built and located to resist racking. Not 'plywood somewhere.'
Change event
Procore field toolsA record of a potential cost or schedule change before it becomes a change order.
Competent person
OSHA 30 ConstructionSomeone who can identify the relevant hazards and has authority to correct them.
De minimis
ASTM E2018 PCAToo minor to treat as a material deficiency. Often routine maintenance. Not a label for life-safety issues.
Deficient
TREC inspector pathA defined checkbox on the TREC form. Broader than 'destroyed.' Read the form definition.
Emergency escape and rescue opening. Required at sleeping rooms, with area, dimension, and sill limits.
EUL / RUL
ASTM E2018 PCAExpected useful life and remaining useful life. Planning judgments from age and condition, not warranties.
Facility Condition Index. Deferred maintenance cost divided by current replacement value.
Fireblocking
ICC B1 ResidentialMaterial installed to cut off concealed draft openings inside framing. Not a synonym for draftstopping.
Focus Four
OSHA 30 ConstructionFalls, struck-by, caught-in/between, and electrocution.
General duty clause
OSHA 30 ConstructionOSH Act section 5(a)(1). Employers must keep the workplace free of recognized serious hazards.
Ground-fault circuit interrupter. Expected protection on temporary construction power.
Hierarchy of controls
OSHA 30 ConstructionElimination, substitution, engineering, administrative, PPE.
Immediate costs
ASTM E2018 PCAOpinions of cost for deficiencies that need action now: safety, material code or fire issues, or failures that will cascade.
JHA
BCSP STSCJob hazard analysis. Steps, hazards, controls, then revision when the work changes.
Material defect
InterNACHI CPIA condition that significantly affects value, safety, or intended function.
Opinion of probable cost
ASTM E2018 PCAA supported estimate, not a bid. Disclose dollar year, basis, and exclusions.
Property condition assessment. A baseline process of walk-through, documents, and interviews to find material physical deficiencies.
Property condition report. The work product of a PCA, including opinions of cost.
Phase I
ASTM E2018 PCAEnvironmental site assessment under ASTM E1527. Not part of a baseline PCA conclusion.
Physical deficiency
ASTM E2018 PCAA conspicuous defect or significant deferred maintenance of a material system or component.
Promulgated form
TREC inspector pathTREC's required inspection report form (the REI form) for inspections that must use it.
Qualified person
OSHA 30 ConstructionSomeone with the technical credentials or knowledge to solve a specific problem. Not the same as competent.
Request for information. A formal question about a gap or conflict in the contract documents.
Route of entry
BCSP STSCHow a chemical gets in: inhalation, ingestion, absorption, or injection.
Short-term costs
ASTM E2018 PCAPriority repairs that are not emergencies and are beyond routine preventive maintenance.
STSC
BCSP STSCSafety Trained Supervisor Construction. A BCSP credential for supervisors with safety duties.
Uniformat II
ASTM E2018 PCAASTM E1557 component classification used heavily in facility condition work.
Fieldbook is original study material so you walk into each paid course already oriented. It is not the ASTM standard, an OSHA outreach card, an ICC exam, a TREC license, or BCSP’s item bank. Code numbers and blueprint weights change by edition. Confirm them in the book or bulletin you will be tested on. Nothing here is legal, licensing, or benefits advice for your VR&E file.