Fieldbook
← Procore field tools

LESSON 1 OF 4 · 11 MIN

Company, project, directory, permissions

Find your way in Procore without memorizing a screenshot.

Two altitudes

Procore splits the world into the company level and the project level. Company level is the portfolio: the directory of companies and people, cost codes, templates, and admin. Project level is one job: drawings, RFIs, the daily log, inspections, budget, photos.

If a tool feels missing, you are often at the wrong altitude or your permission template hides it. Permissions are templates applied to people, not a pile of one-off checkboxes you should beg an admin to invent for you.

The directory is the source of people

Every assignee, every ball-in-court, every distribution list starts in the directory. A punch item assigned to 'someone' who was never added will stall. Before you create items, confirm the property manager, the GC superintendent, and yourself are actually on the project.

Ball-in-court is the product's way of saying whose move it is. A healthy project has short ball-in-court times. An RFI that sits with the architect for three weeks is a schedule story, not a software story.

Drawings are the map

The current set, with revision clouds, is what you walk with. A photo that is not tied to a location or a drawing is a souvenir. A photo pinned to Building 4, north stair, level 2, is evidence. Learn to open the set, see which revision is current, and mark up or reference a location without editing the sealed drawing itself.

CHECK YOURSELF

An RFI has been unanswered for 20 days. The useful question is:

Fieldbook is original study material so you walk into each paid course already oriented. It is not the ASTM standard, an OSHA outreach card, an ICC exam, a TREC license, or BCSP’s item bank. Code numbers and blueprint weights change by edition. Confirm them in the book or bulletin you will be tested on. Nothing here is legal, licensing, or benefits advice for your VR&E file.