LESSON 2 OF 4 · 12 MIN

Superintendent tools

Use the daily log, photos, and punch list the way a super does.

The daily log is the diary that gets read later

Weather, manpower by company, visitors, deliveries, equipment, and a narrative of what happened. Claims and delay arguments get rebuilt from daily logs months later. Write facts. 'Arrived 7:10, roofing crew of 6 on Building C, left at 11 for lightning' beats 'good day.'

If you are the assessor and not the super, you may still be asked to log a site visit. Same habit: time on site, who walked with you, where you could not go, and anything unsafe you stopped for.

Photos and punch

Shoot context, then the defect, then a location cue. Attach the photo to the punch item or the observation so it does not die in the camera roll. A punch item needs a description a trade can price, an assignee, a location, a due date, and a status. 'Fix stuff' is not a punch item.

Close punch only when the work matches the description. Closing it because the owner is visiting is how the same leak returns as a warranty call. Your PM background already knows this. The software just refuses to let the list stay verbal.

Crews, timesheets, equipment

The superintendent track also covers who was on the tools and what iron was on site. You do not need to love timesheets. You need to know they exist so manpower in the daily log is not a guess that contradicts payroll.

CHECK YOURSELF

Which daily-log entry helps a delay claim later?

Fieldbook is original study material so you walk into each paid course already oriented. It is not the ASTM standard, an OSHA outreach card, an ICC exam, a TREC license, or BCSP’s item bank. Code numbers and blueprint weights change by edition. Confirm them in the book or bulletin you will be tested on. Nothing here is legal, licensing, or benefits advice for your VR&E file.